Energen Corporation (EGN) announced a delay on the release of the completion results of its well being drilled to the Chattanooga Shale formation in Tuscaloosa County, Alabama.
The Cain 6-6#1 has a casing leak that needs to be repaired. The well has reached total depth of 7800 feet, and has a 1500-foot lateral. Energen Corporation said it would be as much as 90 days before the completion results of its Chattanooga Shale well would be released.